On November 13, the whole plant system engineering pile and foundation PC project of Guangxi Huayi Energy Chemical Co., Ltd. industrial gas Island project undertaken by South China branch of Guangxi Construction Engineering Group infrastructure Co., Ltd. was successfully started.
The project is located at No.1 dolphin Road, Qinzhou Port Economic and Technological Development Zone, Qinzhou City. The total land area of the project is 2190.7 mu. The South China branch of Guangxi Construction Engineering Group infrastructure Co., Ltd. undertakes the engineering pile and foundation PC project. The bidding price of the project is 46.478 million yuan, including 1888 engineering piles, with a length of about 15 meters and a diameter of 800 mm. It is estimated that the construction period is 45 days and 90 days.
Guangxi Huayi energy and Chemical Co., Ltd. industrial gas Island project is a key project of Huayi Qinzhou new chemical material integration base invested and constructed by Shanghai Huayi Group. The total land area of the project is about 1 million square meters, with a total investment of more than 70 billion yuan.